Standard Operating Procedure

Testing the Cable Reel Operation

Testing the Cable Reel Operation

NOTE

After completing the installation section of this instruction, the component is installed but possibly not ready to operate. A trained machine specialist must proceed with a commissioning start-up procedure to make sure that the machine system status is correct for start-up and all machine safety and functional requirements are met. Refer to the machine-specific manuals for information about machine start-up requirements.

NOTE

Make sure that the work area is clean, free of unwanted material, and tools are returned to the designated locations.

Test the cable reel operation in accordance with the instructions in machine-specific maintenance manual.