Standard Operating Procedure

Preparations and Prerequisites

Preparations and Prerequisites

Labor Resource (People/Skills)

Service Technician x 1

Crane Operator x 1

Technical Data

To select correct lifting devices, stands, and tools, refer to the technical data as detailed throughout the instruction sections.

NOTE

Due to the variation of machine options and components, actual values can differ from data. Data is for reference only.

Machine Technical Data

See machine-specific manuals for weight, dimensions, and other data relevant to bringing the machine to the work area and doing the task.

Component Technical Data

Description

Data

Remarks

Cable reel

239 kg (527 lb)

Boomer M1D

Boltec E

Boltec EC

Cabletec E

Cabletec M

Cabletec LC

Simba M6C

Boltec M

Simba E7C

205 kg (451 lb)

Boomer E2C

Rear Canopy

180 kg (396 lb)

Cabletec LC

Cabletec M

Simba E7C

176 kg (388 lb)

Boltec M

Boomer M1D

Boomer E2C

Boltec EC

Cabletec E

Simba M6C

Boltec E

Tools

Description

Specification

Standard mechanic toolkit

Torque wrench, calibrated

1/2-in drive, capacity up to 171 Nm (126 ft-lb)

Tags

As required

Support Equipment

Description

Specification

Crane

As required

Lifting equipment

As required

Wheel chocks

As required

Maintenance stands

As required

Wooden block

As required

Wooden pallet

As required

Consumables

Description

Specification

Quantity

Not applicable

Spare Parts

NOTE

To create an order list request for the spare parts, refer to the Spare Parts Catalog for your specific machine model and serial number.

Boomer M1D, Boomer E2C, Boltec EC, Cabletec E, Boltec E and Simba M6C Machine

Description

Specification

Quantity

Cable reel

-

1

Screw

Rear canopy

2

Washer

2

Screw

4

Washer

8

Lock nut

4

Screw

Cover plate (left side) to canopy

2

Washer

2

Screw

Cover plate (right side) to canopy

2

Washer

2

Washer

Cable reel cover

6

Lock nut

6

Washer

Wheel and flange

24

Lock nut

24

Screw

A10 panel

2

Washer

2

Screw

Cable reel

6

Washer

6

Chain kit

Cable reel drive

1

Cable gland kit

Cable

1

Cabletec M and Simba E7C Machine

Description

Specification

Quantity

Cable reel

-

1

Screw

Rear canopy

2

Washer

2

Screw

4

Washer

8

Lock nut

4

Screw

Cover plate (left side) to canopy

2

Washer

2

Screw

Cover plate (right side) to canopy

2

Washer

2

Washer

Cable reel cover

6

Lock nut

6

Washer

Wheel and flange

24

Lock nut

24

Screw

A10 panel

2

Washer

2

Screw

Cable reel

6

Washer

6

Chain kit

Cable reel drive

1

Cable gland kit

Cable

1

Boltec M Machine

Description

Specification

Quantity

Cable reel

-

1

Screw

Rear canopy

3

Washer

3

Screw

4

Washer

8

Lock nut

4

Washer

Cable reel cover

6

Lock nut

6

Washer

Wheel and flange

24

Lock nut

24

Screw

A10 panel

2

Washer

2

Screw

Cable reel

6

Washer

6

Chain kit

Cable reel drive

1

Cable gland kit

Cable

1

Suggested Time Required (Standard Planning Hours)

Ref. Section

Description

Planned Time (HH:MM)

5,6

Cable Reel Removal and Installation

04:30

Reference Documentation

The following list of reference material relates to this instruction. Additional specific documentation is referenced at each applicable step.

NOTE

The listed documentation must be available in valid version at the location where the job is being performed.

Manual

Reference

Safety Manual

Model Specific

Operation Manual

Model Specific

Service/Maintenance Manual

Model Specific

Mining and Rock Excavation Torque Specification

Document ID: TIS0006283 en-US

Spare Parts Catalog

Machine Specific (per serial number)

Unwinding Main Power Cable from Reeling Unit

Model Specific Operation Manual

Winding Main Power Cable onto Reeling Unit

Model Specific Operation Manual

Adjusting Reeling Unit Drive Chain

Model Specific Maintenance Manual

Adjust Limit Switch

Model Specific Maintenance Manual