Procedure Report
Use the report to document all of the installation specifications such as torques and pressures.
The report must be completed, signed, and stored to use as a record, if settings or installation conditions requires verification. Include photos where necessary.
Machine / Component Details
Service Order Number: |
Machine Model: |
Machine Number: |
Machine Serial Number: |
Machine Hours: |
Component Model: |
Component Serial Number: |
Technician Name: |
Technician Signature: |
Task Specification
Use this section to record installation specifications such as torques and pressures.
Ref. Step | Installation Step Description | Value |
|---|---|---|
Lifting and Installation | ||
5 | Cable reel flange screws | |
10 | A10 panel mounting screws | |
16 | Wheel and flange mounting lock nuts | |
Preparation of the Component | ||
9 | Cover mounting lock nuts | |
24 | Rear canopy mounting screws |