Standard Operating Procedure

Procedure Report

Procedure Report

Use the report to document all of the installation specifications such as torques and pressures.

The report must be completed, signed, and stored to use as a record, if settings or installation conditions requires verification. Include photos where necessary.

Machine / Component Details

Service Order Number:

Machine Model:

Machine Number:

Machine Serial Number:

Machine Hours:

Component Model:

Component Serial Number:

Technician Name:

Technician Signature:

Task Specifications

Use this section to record installation specifications such as torques and pressures.

Ref. Step

Installation Step Description

Lifting and Installation

12

Rear axle screws

Preparation of the Component

1d

Receiver tank screws

4

Hood cover screws

7

Cover plate screws

viii c

Cover plate (camera kit) screws

viii f

Camera kit screws

13a

Hood screws (Boltec M, Boomer M1D, Simba M6C, Simba E7C, Cabletec E and Cabletec M)

13b

Hood screws (Boltec EC and Boltec E)

13c

Hood screws (Boomer E2C)

13d

Hood screws (Cabletec LC)

xvi a

Plate screws (Boltec M, Boomer M1D,Simba M6C, Simba E7C and Cabletec M)

xvi b

Plate screws (Cabletec E, Boltec EC and Boltec E)

xvi c

Plate screws (Boomer E2C)

xix c

Air filter set screws

24

Driveline screws